COD orders above ₹5,000 required minimum ₹500 advance via WhatsApp confirmation time. No Advance, No Shipment.

EVM 2.5″ SATA SSD Casing USB 3.0 – Portable External Hard Drive/SSD Transparent Case Cover (ESC-TP01)

Rs.199.00

43% Off
Hurry, Only 2 left.

Repack Product in New Condition, 1 Year Brand Warranty with GST Invoice.

What Is Repack Products ?
7 People viewing this product right now!

Service: Only 7 Days Replacement Policy *

Note: Open Box Delivery Is Not Available

SKU: ESC-TP01

COD Avail with Partial Payment

if you order in COD above 5000 Products, You need to Pay min 500/- Advance Payment at order confirmation time on whastapp, Do not order if you are not agree with our Policy - Read More

Description
EVM 2.5″ SATA SSD Casing USB 3.0 – Portable External Hard Drive/SSD Transparent Case Cover – Fast Transfer Speeds Upto 5Gbps, On-The-Go Storage & Data Backup (ESC-TP01)

About this item

  • Size : 2.5 Inch HDD & SSD 9.5mm Internal HDD/SSD Port: SATA port
  • PCB size: Small PCB Material: Plastic
  • Color: Transparent Outer port : USB 3.0 port
  • maximum support: 4TB Capacity
  • Power supply: USB port power Supply Directly

The EVM 2.5 Inch SATA SSD Casing USB 3.0 is a portable external hard drive enclosure designed specifically for 2.5-inch SATA solid-state drives (SSDs). It features a transparent case cover that allows you to see the internals of your SSD, giving it a modern and stylish look. Equipped with a USB 3.0 interface, this casing provides fast transfer speeds of up to 5Gbps. This ensures quick and efficient data transfer and backup, allowing you to move large files and folders in a fraction of the time compared to traditional USB 2.0 enclosures. The USB 3.0 connection is backward compatible with USB 2.0 ports, ensuring compatibility with a wide range of devices such as laptops, desktops, and gaming consoles. The casing is designed to be portable and convenient for on-the-go storage and data backup. It is small, lightweight, and easy to carry, making it ideal for students, professionals, and travelers who need to take their SSD and important data with them wherever they go. Whether you need to transfer files between computers, back up important documents, or store multimedia content, this casing offers a reliable and portable solution.

Technical Details

BrandEVM
ModelESC-TP01
Product Type2.5″ SATA SSD/HDD External Enclosure
Compatible Drive Size2.5-inch SATA I/II/III HDD & SSD
InterfaceSATA to USB 3.0
Transfer SpeedUp to 5 Gbps (USB 3.0)
Backward CompatibilityUSB 2.0 & USB 1.1
MaterialTransparent Plastic Case
DesignTool-Free Design (Easy installation, no screws needed)
Supported Storage CapacityUp to 2TB / 4TB (depends on drive)
Plug & PlayYes (No driver required)
Power SupplyUSB Powered (No external power required)
Supported SystemsWindows, macOS, Linux, Android (OTG supported)
Use CasePortable External Storage, Data Backup, File Transfer
Dimensions (Approx.)125mm x 80mm x 13mm
Weight~70g
Warranty1 Year
Scroll To Top
Close
Close
Close

My Cart

Shopping cart is empty!

Continue Shopping

EVM 2.5 SATA SSD Casing USB 3.0 - Portable External Hard DriveSSD Transparent Case Cover
EVM 2.5″ SATA SSD Casing USB 3.0 – Portable External Hard Drive/SSD Transparent Case Cover (ESC-TP01)
Rs.199.00 Add to cart