EVM 2.5″ SATA SSD Casing USB 3.0 – Portable External Hard Drive/SSD Transparent Case Cover – Fast Transfer Speeds Upto 5Gbps, On-The-Go Storage & Data Backup (ESC-TP01)
About this item
- Size : 2.5 Inch HDD & SSD 9.5mm Internal HDD/SSD Port: SATA port
- PCB size: Small PCB Material: Plastic
- Color: Transparent Outer port : USB 3.0 port
- maximum support: 4TB Capacity
- Power supply: USB port power Supply Directly
The EVM 2.5 Inch SATA SSD Casing USB 3.0 is a portable external hard drive enclosure designed specifically for 2.5-inch SATA solid-state drives (SSDs). It features a transparent case cover that allows you to see the internals of your SSD, giving it a modern and stylish look. Equipped with a USB 3.0 interface, this casing provides fast transfer speeds of up to 5Gbps. This ensures quick and efficient data transfer and backup, allowing you to move large files and folders in a fraction of the time compared to traditional USB 2.0 enclosures. The USB 3.0 connection is backward compatible with USB 2.0 ports, ensuring compatibility with a wide range of devices such as laptops, desktops, and gaming consoles. The casing is designed to be portable and convenient for on-the-go storage and data backup. It is small, lightweight, and easy to carry, making it ideal for students, professionals, and travelers who need to take their SSD and important data with them wherever they go. Whether you need to transfer files between computers, back up important documents, or store multimedia content, this casing offers a reliable and portable solution.
Technical Details
| Brand | EVM |
| Model | ESC-TP01 |
| Product Type | 2.5″ SATA SSD/HDD External Enclosure |
| Compatible Drive Size | 2.5-inch SATA I/II/III HDD & SSD |
| Interface | SATA to USB 3.0 |
| Transfer Speed | Up to 5 Gbps (USB 3.0) |
| Backward Compatibility | USB 2.0 & USB 1.1 |
| Material | Transparent Plastic Case |
| Design | Tool-Free Design (Easy installation, no screws needed) |
| Supported Storage Capacity | Up to 2TB / 4TB (depends on drive) |
| Plug & Play | Yes (No driver required) |
| Power Supply | USB Powered (No external power required) |
| Supported Systems | Windows, macOS, Linux, Android (OTG supported) |
| Use Case | Portable External Storage, Data Backup, File Transfer |
| Dimensions (Approx.) | 125mm x 80mm x 13mm |
| Weight | ~70g |
| Warranty | 1 Year |



































